Surveying and geospatial data service
As-Built Survey and Plans
We record the constructed condition and prepare clear as-built survey documentation for the agreed task.

Scope and deliverables
- Survey of the actual position of buildings, roads, paved areas and utilities
- Processing of survey data into a drawing suitable for comparison
- As-built plan for site documentation in the agreed format
When it is needed
An as-built survey records the actual position of a constructed feature or utility. It helps document completed work and compare it with the design. Plan the survey alongside construction, rather than only after completion, when necessary elements may already be covered.
Work and deliverables
We clarify the elements, design inputs and plan requirements, take measurements and prepare the agreed output. Underground utilities installed in open trenches are surveyed before backfilling. Requirements for other installation methods, such as horizontal drilling, must be clarified separately before work starts.
Information to provide
Provide current design drawings, the site location and details of constructed elements and changes. Include the construction manager's contact, access arrangements and planned backfilling or covering time. Agree the recipient's requirements and file format early enough to coordinate the survey.
Timing and price
Scope depends on the number of features, utility length, access, construction stage and repeat visits. Schedule changes may require new coordination. A backfilled trench cannot be surveyed in the same way as an open trench; any further approach needs separate assessment.
Important limitations
Cabinet Regulation No. 281 does not set an expiry period for an as-built plan, but it records conditions at the measurement date. It does not guarantee that later changes are reflected or that every recipient accepts it without additional requirements. Acceptance conditions depend on the particular brief.